Designed with no single point of failure.
Every facility is built to the same engineering standard: two independent power paths, redundant cooling, seven layers of physical security and uninterrupted operation even during maintenance.
Anatomy of a Kale campus.
The FRA-1 Frankfurt campus has four data halls, rooftop free-cooling chillers, a 2N+1 generator yard and two separate substations. Our other facilities follow the same reference design.
Six systems inside the hall.
Click the numbers to explore the specifications of the power, cooling, security, fire, network and operations systems.
FRA-1 · Hall 3Cutaway · 2,240 m² · 246 racks
Power
Every hall is fed from two independent substations. Each of the A and B paths can carry the full load on its own.
| UPS architecture | 2N |
|---|---|
| Generators | 2N+1 |
| On-site fuel | 72 hours |
| Utility feed | Two separate substations |
| Per rack | Up to 130 kW |
Cooling
Precision cooling units run N+1. Free cooling removes the need for compressors for most of the year.
| Precision cooling | N+1 CRAH |
|---|---|
| Free cooling | 70% of the year |
| Liquid cooling | DLC and RDHx |
| Aisles | Hot-aisle containment |
| Annual PUE | 1.24 |
Security
Seven separate checkpoints stand between the gate and the hall. Every pass is matched to an identity and logged.
| Physical layers | 7 layers |
|---|---|
| Authentication | Biometric + card + PIN |
| Entry | Mantrap portals |
| CCTV retention | 90 days |
| Security staff | On site 24/7 |
Fire & hazards
Air-sampling VESDA detectors catch smoke minutes early. Suppression uses a gas that does not harm equipment.
| Early warning | VESDA |
|---|---|
| Suppression | Novec 1230 gas |
| Seismic | Base isolators |
| Flood | Outside flood zones |
| Building | Single-story concrete |
Network
Carriers enter the building through the MMR over diverse routes. Cross-connect requests are completed the same day.
| Carriers | 400+ |
|---|---|
| Backbone | 400G |
| Fiber entry | 4 diverse entry points |
| Cross-connects | Same day |
| Routing | RPKI-validated BGP |
Operations
Every location has engineers on site. Work in your cage starts within 15 minutes and is fully reported.
| NOC | 24/7 Istanbul |
|---|---|
| Response | 15 minutes |
| Engineers | On site at every location |
| Portal | DCIM and API |
| Maintenance | Concurrently maintainable |
Two independent paths to every rack.
The A and B feeds come from different substations, and each is sized to carry the full load on its own. If the grid fails, generators take over within 10 seconds.
Seven checkpoints to your rack.
- 01Perimeter
Double fencing, vehicle barriers and thermal cameras along the site boundary.
- 02Building entry
24/7 security staff, appointments and ID checks.
- 03Mantrap
Single-person portals; only one person can pass at a time.
- 04Data hall
Three-factor authentication with biometrics, card and PIN.
- 05Cage
Customer-specific card readers and in-cage cameras.
- 06Rack
Locked rack doors; every opening is logged.
- 07Records
All entries and camera footage are kept for 90 days.
The same standard at every facility.
Site-specific values and single-line diagrams are shared with your technical team after a non-disclosure agreement.
Power
| UPS architecture | 2N |
|---|---|
| Generators | 2N+1 |
| On-site fuel | 72 hours |
| Utility feed | Two separate substations |
| Per rack | Up to 130 kW |
Cooling
| Precision cooling | N+1 CRAH |
|---|---|
| Free cooling | 70% of the year |
| Liquid cooling | DLC and RDHx |
| Aisles | Hot-aisle containment |
| Annual PUE | 1.24 |
Security
| Physical layers | 7 layers |
|---|---|
| Authentication | Biometric + card + PIN |
| Entry | Mantrap portals |
| CCTV retention | 90 days |
| Security staff | On site 24/7 |
Fire & hazards
| Early warning | VESDA |
|---|---|
| Suppression | Novec 1230 gas |
| Seismic | Base isolators |
| Flood | Outside flood zones |
| Building | Single-story concrete |
Network
| Carriers | 400+ |
|---|---|
| Backbone | 400G |
| Fiber entry | 4 diverse entry points |
| Cross-connects | Same day |
| Routing | RPKI-validated BGP |
Operations
| NOC | 24/7 Istanbul |
|---|---|
| Response | 15 minutes |
| Engineers | On site at every location |
| Portal | DCIM and API |
| Maintenance | Concurrently maintainable |
Independently audited every year.
Certificates and audit reports are shared after a non-disclosure agreement.
-
Uptime Tier IVDesign & construction
-
ISO 27001Information security
-
ISO 22301Business continuity
-
ISO 9001Quality management
-
ISO 50001Energy management
-
PCI DSSPayment security
-
SOC 2 Type IIAudit report
-
KVKKData protection