High-Density and Liquid-Cooled AI Data Centers

High-density space with direct-to-chip liquid cooling, up to 130 kW per rack, built for GPU clusters and AI workloads.

Liquid-cooled high-density GPU racks and coolant distribution unitCoolant distribution unitCDU · N+1 pumpsDirect-to-chip liquid loopSupply 32 °C · return 45 °CGPU node130 kW per rack
Per rack
Up to 130 kW
Cooling
DLC · RDHx
Floor load
2,000 kg/m²
Network
800G-ready
Features

High Density & AI: what's included

Every feature is delivered to the same standard in all 34 locations, under a single contract.

01

Direct-to-chip cooling

Liquid cooling to CPUs and GPUs through CDU and manifold infrastructure.

02

Rear-door heat exchangers

Supplements air cooling for racks in the 30–50 kW range.

03

Reinforced floors

Floors rated for 2,000 kg/m² to carry heavy GPU servers.

04

InfiniBand-ready

Rail-optimized cabling and low-latency cluster network design.

05

Leak detection

Continuously monitored leak sensors under every manifold and rack.

06

Heat reuse

Waste heat transferred to district heating networks.

Options

The right configuration for your needs.

Pricing depends on capacity, location and contract term. Our solution architects prepare a quote within one business day.

High density

Air plus rear-door cooling

  • 30 kW per rack
  • Rear-door heat exchanger
  • Hot-aisle containment
  • 100G connectivity
Request a quote

Liquid cooling

Direct-to-chip

  • 80 kW per rack
  • CDU and manifolds
  • Leak detection
  • 400G connectivity
Request a quote

AI pod

Ready-made block for GPU clusters

  • 130 kW per rack
  • 8–32 rack blocks
  • InfiniBand fabric
  • 800G-ready
Request a quote

AI factory

Megawatt-scale AI hall

  • Up to 5 MW
  • Dedicated cooling loop
  • Dedicated substation
  • Phased delivery
Request a quote
Frequently asked questions

High Density & AI, explained.

For questions about your project, our solution architects reply within one business day.

Ask a question
Which GPU systems do you support?

We design power, cooling and cabling for all high-draw GPU servers, including current-generation HGX and DGX systems.

Can we bring our own CDU for liquid cooling?

Yes. You can connect your own CDU to the facility water loop or use the CDU infrastructure we provide.

How quickly is an AI pod delivered?

Standard AI pod blocks are typically delivered within 8 to 12 weeks.